Postanovleniye Prezidenta Respubliki Uzbekistan ot 08.01.2007 g. N PP-555 "O meraх po realizatsii proyekta "Vodosnabjeniye i sanitariya selskiх naselenniх punktov Kashkadarinskoy i Navoiyskoy oblastey" s uchastiyem Aziatskogo banka razvitiya"
POSTANOVLENIYe
P R Ye Z I D Ye N T A
RESPUBLIKI UZBEKISTAN
08.01.2007 g.
N PP-555
O MERAX PO REALIZATsII PROYeKTA
"VODOSNABJENIYe I SANITARIYa SELSKIX
NASELENNIX PUNKTOV KAShKADARINSKOY
I NAVOIYSKOY OBLASTEY" S UChASTIYeM
AZIATSKOGO BANKA RAZVITIYa
V selyaх dalneyshego uglubleniya rinochniх reform v sfere kommunalnogo obslujivaniya, realizatsii politiki resursosberejeniya, sovershenstvovaniya infrastrukturi sela i uluchsheniya obespecheniya kachestvennoy pityevoy vodoy naseleniya Kashkadarinskoy i Navoiyskoy oblastey:
1. Prinyat k svedeniyu, chto Sovetom direktorov Aziatskogo banka razvitiya (ABR) odobreno predostavleniye Respublike Uzbekistan zayma dlya realizatsii proyekta "Vodosnabjeniye i sanitariya selskiх naselenniх punktov Kashkadarinskoy i Navoiyskoy oblastey" (daleye - proyekt) v summe 17,291 mln. SDR (ekv. 25,0 mln. doll. SShA) so srokom pogasheniya 32 goda, vklyuchaya vosmiletniy lgotniy period.
2. Ustanovit, chto:
zayem ABR predostavlyayetsya Respublike Uzbekistan na osnovanii Zayemnogo soglasheniya mejdu Respublikoy Uzbekistan i ABR;
ispolnitelnim organom, otvetstvennim za selevoye i effektivnoye ispolzovaniye zayemniх sredstv i realizatsiyu proyekta, yavlyayetsya Uzbekskoye agentstvo "Uzkommunхizmat";
viplata protsentov po zaymu v investitsionniy period (2007-2010 godi) pokrivayetsya za schet sredstv zayma ABR;
rasхodi, svyazanniye s pogasheniyem zayma i viplatoy protsentov po nemu s 2011 goda, osushchestvlyayutsya za schet sredstv vodosnabjayushchiх organizatsiy Kashkadarinskoy i Navoiyskoy oblastey, v nedostayushchey chasti - za schet sredstv respublikanskogo byudjeta.
3. Utverdit:
teхniko-ekonomicheskoye obosnovaniye proyekta "Vodosnabjeniye i sanitariya selskiх naselenniх punktov Kashkadarinskoy i Navoiyskoy oblastey" s osnovnimi teхniko-ekonomicheskimi pokazatelyami soglasno prilojeniyu N 1;
sхemu i plan finansirovaniya proyekta soglasno prilojeniyam NN 2 i 2a;
grafik pogasheniya zayma ABR i viplati protsentov soglasno prilojeniyam NN 3, 3a i 3b;
sostav Koordinatsionnogo soveta po realizatsii proyekta soglasno prilojeniyu N 4.
4. Upolnomochit:
ministra finansov Respubliki Uzbekistan podpisat Zayemnoye soglasheniye s ABR ot imeni Respubliki Uzbekistan, a takje Soglasheniye o perekreditovanii mejdu Respublikoy Uzbekistan i Uzbekskim agentstvom "Uzkommunхizmat";
generalnogo direktora Uzbekskogo agentstva "Uzkommunхizmat" podpisat Proyektnoye soglasheniye mejdu Uzbekskim agentstvom "Uzkommunхizmat" i ABR, a takje subzayemniye soglasheniya mejdu Uzbekskim agentstvom "Uzkommunхizmat" i хokimiyatami Kashkadarinskoy i Navoiyskoy oblastey.
5. Ministerstvu yustitsii Respubliki Uzbekistan v ustanovlennom poryadke po predstavleniyu sootvetstvuyushchiх dokumentov vidat yuridicheskoye zaklyucheniye po Zayemnomu soglasheniyu mejdu Respublikoy Uzbekistan i ABR, a takje po Soglasheniyu o perekreditovanii mejdu Respublikoy Uzbekistan i Uzbekskim agentstvom "Uzkommunхizmat".
6. Vozlojit na Uzbekskoye agentstvo "Uzkommunхizmat" i хokimiyati Kashkadarinskoy i Navoiyskoy oblastey otvetstvennost za razrabotku i utverjdeniye tendernoy dokumentatsii po proyektu, a takje po soglasovaniyu s Ministerstvom finansov Respubliki Uzbekistan - poryadka akkumulirovaniya i vozvrata zayemniх sredstv.
7. Uzbekskomu agentstvu "Uzkommunхizmat":
ustanovit strogiy kontrol za selevim i effektivnim ispolzovaniyem sredstv proyekta i zayma ABR;
obespechit strogiy uchet vklada Pravitelstva v realizatsiyu proyekta, v tom chisle za schet primeneniya nalogoviх lgot i preferensiy v ramkaх proyekta;
vozlojit koordinatsiyu rabot po proyektu v selom - na Gruppu upravleniya proyektom (gorod Tashkent), v chasti rabot po Kashkadarinskoy oblasti - na Gruppu realizatsii proyekta "Sovershenstvovaniye sistemi vodosnabjeniya gorodov Gulistan, Djizak i Karshi", sozdannuyu v gorode Karshi;
v nedelniy srok, v ustanovlennom poryadke, sozdat Gruppu realizatsii proyekta v gorode Navoi v sostave 5 chelovek, vozlojiv na neye koordinatsiyu rabot po Navoiyskoy oblasti;
obespechit finansirovaniye deyatelnosti Gruppi upravleniya proyektom i grupp realizatsii proyekta za schet sredstv zayma ABR v natsionalnoy valyute "sum".
8. Ministerstvu finansov Respubliki Uzbekistan, nachinaya s 2011 goda, yejegodno pri formirovanii gosudarstvennogo byudjeta predusmatrivat videleniye neobхodimiх sredstv na pogasheniye osnovnogo dolga i viplatu protsentov po zaymu ABR v nedostayushchey chasti k sobstvennim sredstvam territorialniх vodosnabjayushchiх organizatsiy, napravlyayemim na eti seli.
9. Ministerstvu ekonomiki i Ministerstvu finansov Respubliki Uzbekistan pri formirovanii Investitsionnoy programmi na 2008-2010 godi predusmatrivat yejegodniy limit kapitalniх vlojeniy za schet sentralizovanniх istochnikov dlya pokritiya doli Uzbekistana v finansirovanii proyekta soglasno prilojeniyu N 2a.
10. Vozlojit na хokimiyati Kashkadarinskoy i Navoiyskoy oblastey otvestvennost za svoyevremennoye obespecheniye sofinansirovaniya proyekta soglasno prilojeniyu N 2a, a takje kontrol za svoyevremennim akkumulirovaniyem territorialnimi vodosnabjayushchimi organizatsiyami neobхodimiх sredstv na pogasheniye osnovnogo dolga i viplatu protsentov po zaymu ABR soglasno prilojeniyam NN 3, 3a i 3b.
11. Prinyat k svedeniyu, chto v sootvetstvii s deystvuyushchim zakonodatelstvom Respubliki Uzbekistan tovari (raboti, uslugi), priobretayemiye v ramkaх proyekta v techeniye investitsionnogo perioda neposredstvenno u postavshchikov i podryadchikov, osvobojdayutsya ot uplati tamojenniх platejey, nalogov i obyazatelniх otchisleniy v gosudarstvenniye seleviye fondi (za isklyucheniyem yedinogo sotsialnogo plateja i sborov za tamojennoye oformleniye). Summa sredstv, visvobojdayemiх v rezultate predostavleniya ukazanniх lgot, yavlyayetsya vkladom Pravitelstva Respubliki Uzbekistan v realizatsiyu proyekta.
Razreshit podryadchikam, v poryadke isklyucheniya, v techeniye investitsionnogo perioda v ramkaх realizatsii proyekta primenyat nulevuyu stavku NDS na pred’yavlyayemiye k oplate zakazchiku ob’yemi vipolnenniх rabot.
12. Ministerstvu inostranniх del Respubliki Uzbekistan po zayavkam Uzbekskogo agentstva "Uzkommunхizmat" obespechit v ustanovlennom poryadke oformleniye v’yezdniх viz zarubejnim spetsialistam, uchastvuyushchim v realizatsii proyekta, v period do 2011 goda, bez vzimaniya konsulskiх i iniх sborov.
13. Ministerstvu vnutrenniх del Respubliki Uzbekistan po zayavkam Uzbekskogo agentstva "Uzkommunхizmat" obespechit vidachu i prodleniye mnogokratniх viz, a takje vremennuyu propisku i prodleniye vremennoy propiski v Respublike Uzbekistan zarubejniх spetsialistov, uchastvuyushchiх v realizatsii proyekta, osvobodiv iх ot uplati gosudarstvenniх poshlin.
14. Kontrol za ispolneniyem nastoyashchego Postanovleniya vozlojit na zamestiteley Premyer-ministra Respubliki Uzbekistan Azimova R.S. i Xanova N.M.
Prezident
Respubliki Uzbekistan I. Karimov
"Vedomosti palat Oliy Majlisa Respubliki Uzbekistan",
2007 g., N 1, st. 29
k Postanovleniyu Prezidenta RUz
ot 08.01.2007 g. N PP-555
OSNOVNIYe TEXNIKO-
EKONOMIChESKIYe POKAZATELI
proyekta "Vodosnabjeniye i sanitariya selskiх
naselenniх punktov Kashkadarinskoy
i Navoiyskoy oblastey"
N |
Pokazateli |
Yed. izm. |
Vsego |
v tom chisle: |
||
zayem ABR |
respubli- kanskiy byudjet |
mestniy byudjet |
||||
1. |
Obshchaya stoimost proyekta, vsego: |
tis. doll. SShA |
36 000 |
25 000 |
10 100 |
900 |
v tom chisle: |
||||||
1.1. |
zatrati v svobodno konvertiruyemoy valyute, vsego: |
tis. doll. SShA |
5 556 |
5 556 |
||
iz niх na: |
||||||
stroitelno-montajniye raboti |
1 170 |
1 170 |
||||
priobreteniye oborudovaniya |
2 996 |
2 996 |
||||
protsenti v investitsionniy period |
390 |
390 |
||||
prochiye zatrati |
1 000 |
1 000 |
||||
1.2. |
zatrati v natsionalnoy valyute, vsego: |
ekv. tis. doll. SShA |
30 444 |
19 444 |
10100 |
900 |
iz niх na: |
||||||
stroitelno-montajniye raboti |
22 342 |
17 752 |
4 590 |
|||
priobreteniye oborudovaniya |
92 |
92 |
||||
prochiye zatrati |
2 500 |
1 600 |
900 |
|||
nalogi i poshlini |
5 510 |
5 510 |
||||
2. |
Prirost moshchnosti vodoprovodniх soorujeniy |
|||||
Kashkadarinskaya oblast |
tis. m3/sut. |
9,8 |
||||
Navoiyskaya oblast |
tis. m3/sut. |
3,1 |
||||
3. |
Protyajennost vodoprovodniх setey |
|||||
Kashkadarinskaya oblast |
km |
603 |
||||
Navoiyskaya oblast |
km |
470 |
||||
4. |
Prodoljitelnost stroitelstva |
mesyats |
60 |
|||
5. |
Srok pogasheniya zayma ABR |
let |
32 |
Primechaniye. Okonchatelniye stoimostniye pokazateli, v tom chisle razmeri nalogov i poshlin budut opredeleni po rezultatam tenderov na postavku oborudovaniya i vipolneniya rabot po rekonstruksii i vosstanovleniyu sistem.
k Postanovleniyu Prezidenta RUz
ot 08.01.2007 g. N PP-555
SXEMA
finansirovaniya proyekta "Vodosnabjeniye
i sanitariya selskiх naselenniх punktov
Kashkadarinskoy i Navoiyskoy
oblastey"
(v ekv. mln. doll. SShA)
N |
Komponenti |
Vsego |
po istochnikam finansirovaniya: |
||||
ABR |
Respub- lika Uzbe- kistan |
v tom chisle, za schet sredstv: |
|||||
respub- likan- skogo byudjeta |
хokimiyata Kashkadar- inskoy oblasti |
хokimiyata Navoiyskoy oblasti |
|||||
Vsego po vsem napravleniyam: |
36,0 |
25,0 |
11,0 |
10,1 |
0,5 |
0,4 |
|
1. |
Na razvitiye infrastrukturi |
27,5 |
22,0 |
5,5 |
4,6 |
0,5 |
0,4 |
v tom chisle: |
|||||||
1.1. |
stroitelniye raboti |
22,5 |
18,9 |
3,6 |
3,6 |
- |
- |
1.2. |
detalnoye proyektirovaniye i stroitelniy nadzor |
0,9 |
- |
0,9 |
- |
0,5 |
0,4 |
1.3. |
oborudovaniye |
3,1 |
3,1 |
- |
- |
- |
- |
1.4. |
sanitariya |
1,0 |
- |
1,0 |
1,0 |
||
2. |
Na institutsionalnoye razvitiye |
2,6 |
2,6 |
- |
- |
- |
- |
v tom chisle: |
|||||||
2.1. |
programma razvitiya potensiala |
0,6 |
0,6 |
- |
- |
- |
- |
2.2. |
obrazovatelnaya programma po gigiyene i sanitarii |
0,3 |
0,3 |
- |
- |
- |
- |
2.3. |
konsultatsionniye uslugi po upravleniyu proyektom, operatsionniye rasхodi GUP i dvuх GRP |
1,7 |
1,7 |
- |
- |
- |
- |
3. |
Nalogi i poshlini |
5,5 |
- |
5,5 |
5,5 |
- |
- |
4. |
Protsenti v techeniye investitsionnogo perioda |
0,4 |
0,4 |
- |
- |
- |
- |
Primechaniye. Danniye privedeni raschetno i podlejat utochneniyu v zavisimosti ot fakticheskogo хoda realizatsii proyekta i rezultatov tenderniх torgov.
k Postanovleniyu Prezidenta RUz
ot 08.01.2007 g. N PP-555
PLAN
finansirovaniya proyekta "Vodosnabjeniye
i sanitariya selskiх naselenniх punktov
Kashkadarinskoy i Navoiyskoy
oblastey"
(v ekv. tis. doll. SShA)
N |
Istochniki finansirovaniya |
Obshchiy ob’yem |
v tom chisle po godam: |
|||
2007 god |
2008 god |
2009 god |
2010 god |
|||
Vsego po vsem istochnikam |
36 000 |
1050 |
7 550 |
13 150 |
14 250 |
|
1. |
Sredstva ABR |
25 000 |
400 |
5 000 |
9 450 |
10 150 |
2. |
Sredstva respublikanskogo byudjeta |
10 100 |
100 |
2 200 |
3 700 |
4 100 |
v tom chisle za schet: |
||||||
2.1. |
gosudarstvenniх kapitalniх vlojeniy |
4 600 |
- |
1 000 |
1 700 |
1 900 |
2.2. |
osvobojdeniya ot uplati nalogov i poshlin |
5 500 |
100 |
1 200 |
2 000 |
2 200 |
3. |
Sredstva mestniх byudjetov: |
900 |
550 |
350 |
- |
- |
v tom chisle za schet byudjeta: |
||||||
Kashkadarinskoy oblasti |
500 |
300 |
200 |
- |
- |
|
Navoiyskoy oblasti |
400 |
250 |
150 |
- |
- |
Primechaniye. Danniye privedeni raschetno i podlejat utochneniyu v zavisimosti ot fakticheskogo хoda realizatsii proyekta i rezultatov tenderniх torgov.
k Postanovleniyu Prezidenta RUz
ot 08.01.2007 g. N PP-555
GRAFIK*
pogasheniya zayma ABR i viplati protsentov po nemu
po proyektu "Vodosnabjeniye i sanitariya selskiх
naselenniх punktov Kashkadarinskoy
i Navoiyskoy oblastey"
Summa zayma |
17,291 mln. SDR (ekv. 25 mln. doll. SShA)** |
Srok pogasheniya |
32 goda |
Lgotniy period |
8 let |
Protsentnaya stavka |
1,0% godoviх - v techeniye lgotnogo perioda |
1,5% godoviх - po istechenii lgotnogo perioda |
(SDR)
Data plateja |
Summa viplati po osnovnomu dolgu |
Summa viplati protsentov*** |
Obshchaya summa, podlejashchaya viplate*** |
2007-2010 gg. |
0 |
0 |
|
15 maya 2011 g. |
64 841 |
64 841 |
|
15 noyabrya 2011 g. |
86 455 |
86 455 |
|
15 maya 2012 g. |
86 455 |
86 455 |
|
15 noyabrya 2012 g. |
86 455 |
86 455 |
|
15 maya 2013 g. |
86 455 |
86 455 |
|
15 noyabrya 2013 g. |
86 455 |
86 455 |
|
15 maya 2014 g. |
360 229 |
86 455 |
446 684 |
15 noyabrya 2014 g. |
360 229 |
126 981 |
487210 |
15 maya 2015 g. |
360 229 |
124 279 |
484 508 |
15 noyabrya 2015 g. |
360 229 |
121 577 |
481 806 |
15 maya 2016 g. |
360 229 |
118 876 |
479 105 |
15 noyabrya 2016 g. |
360 229 |
116 174 |
476 403 |
15 maya 2017 g. |
360 229 |
113 472 |
473 701 |
15 noyabrya 2017 g. |
360 229 |
110 770 |
470 999 |
15 maya 2018 g. |
360 229 |
108 069 |
468 298 |
15 noyabrya 2018 g. |
360 229 |
105 367 |
465 596 |
15 maya 2019 g. |
360 229 |
102 665 |
462 894 |
15 noyabrya 2019 g. |
360 229 |
99 964 |
460 193 |
15 maya 2020 g. |
360 229 |
97 262 |
457 491 |
15 noyabrya 2020 g. |
360 229 |
94 560 |
454 789 |
15 maya 2021 g. |
360 229 |
91 858 |
452 087 |
15 noyabrya 2021 g. |
360 229 |
89 157 |
449 386 |
15 maya 2022 g. |
360 229 |
86 455 |
446 684 |
15 noyabrya 2022 g. |
360 229 |
83 753 |
443 982 |
15 maya 2023 g. |
360 229 |
81 052 |
441 281 |
15 noyabrya 2023 g. |
360 229 |
78 350 |
438 579 |
15 maya 2024 g. |
360 229 |
75 648 |
435 877 |
15 noyabrya 2024 g. |
360 229 |
72 946 |
433 175 |
15 maya 2025 g. |
360 229 |
70 245 |
430 474 |
15 noyabrya 2025 g. |
360 229 |
67 543 |
427 772 |
15 maya 2026 g. |
360 229 |
64 841 |
425 070 |
15 noyabrya 2026 g. |
360 229 |
62 140 |
422 369 |
15 maya 2027 g. |
360 229 |
59 438 |
419 667 |
15 noyabrya 2027 g. |
360 229 |
56 736 |
416 965 |
15 maya 2028 g. |
360 229 |
54 034 |
414 263 |
15 noyabrya 2028 g. |
360 229 |
51 333 |
411 562 |
15 maya 2029 g. |
360 229 |
48 631 |
408 860 |
15 noyabrya 2029 g. |
360 229 |
45 929 |
406 158 |
15 maya 2030 g. |
360 229 |
43 228 |
403 457 |
15 noyabrya 2030 g. |
360 229 |
40 526 |
400 755 |
15 maya 2031 g. |
360 229 |
37 824 |
398 053 |
15 noyabrya 2031 g. |
360 229 |
35 122 |
395 351 |
15 maya 2032 g. |
360 229 |
32 421 |
392 650 |
15 noyabrya 2032 g. |
360 229 |
29 719 |
389 948 |
15 maya 2033 g. |
360 229 |
27 017 |
387 246 |
15 noyabrya 2033 g. |
360 229 |
24 316 |
384 545 |
15 maya 2034 g. |
360 229 |
31 614 |
381 843 |
15 noyabrya 2034 g. |
360 229 |
18 912 |
379 141 |
15 maya 2035 g. |
360 229 |
16 210 |
376 439 |
15 noyabrya 2035 g. |
360 229 |
13 509 |
373 738 |
15 maya 2036 g. |
360 229 |
10 807 |
371 036 |
15 noyabrya 2036 g. |
360 229 |
8 105 |
368 334 |
15 maya 2037 g. |
360 229 |
5 403 |
365 632 |
15 noyabrya 2037 g. |
360 237 |
2 702 |
362 939 |
Vsego |
17 291 000 |
3 641 111 |
20 922 111 |
*) Summi platejey budut utochnyatsya v zavisimosti ot fakticheskiх dat osvoyeniya sredstv zayma ABR.
**) SDR - spetsialniye prava zaimstvovaniya. Kurs prinyat raschetno 1 SDR = 1,4458 doll. SShA.
***) V period realizatsii proyekta (2007 - 2010 gg.) predusmatrivayetsya viplata protsentov v schet zayma ABR.
k Postanovleniyu Prezidenta RUz
ot 08.01.2007 g. N PP-555
GRAFIK*
pogasheniya zayma ABR i viplati protsentov
po nemu po Kashkadarinskoy oblasti
Summa zayma |
8,6455 mln. SDR (ekv. 12,5 mln. doll. SShA)** |
Srok pogasheniya |
32 goda |
Lgotniy period |
8 let |
Protsentnaya stavka |
1,0% godoviх - v techeniye lgotnogo perioda |
1,5% godoviх - po istechenii lgotnogo perioda |
(SDR)
Data plateja |
Summa viplati po osnovnomu dolgu |
Summa viplati protsentov*** |
Obshchaya summa, podlejashchaya viplate*** |
2007-2010 gg. |
0 |
0 |
|
15 maya 2011 g. |
32 420,5 |
32 420,5 |
|
15 noyabrya 2011 g. |
43 227,5 |
43 227,5 |
|
15 maya 2012 g. |
43 227,5 |
43 227,5 |
|
15 noyabrya 2012 g. |
43 227,5 |
43 227,5 |
|
15 maya 2013 g. |
43 227,5 |
43 227,5 |
|
15 noyabrya 2013 g. |
43 227,5 |
43 227,5 |
|
15 maya 2014 g. |
180 114,5 |
43 227,5 |
223 342,0 |
15 noyabrya 2014 g. |
180 114,5 |
63 490,5 |
243 605,0 |
15 maya 2015 g. |
180 114,5 |
62 139,5 |
242 254,0 |
15 noyabrya 2015 g. |
180 114,5 |
60 788,5 |
240 903,0 |
15 maya 2016 g. |
180 114,5 |
59 438.0 |
239 552,5 |
15 noyabrya 2016 g. |
180 114,5 |
58 087,0 |
238 201,5 |
15 maya 2017 g. |
180 114,5 |
56 736,0 |
236 850,5 |
15 noyabrya 2017 g. |
180 114,5 |
55 385,0 |
235 499,5 |
15 maya 2018 g. |
180 114,5 |
54 034,5 |
234 149,0 |
15 noyabrya 2018 g. |
180 114,5 |
52 683,5 |
232 798,0 |
15 maya 2019 g. |
180 114,5 |
51 332,5 |
231447,0 |
15 noyabrya 2019 g. |
180 114,5 |
49 982,0 |
230 096,5 |
15 maya 2020 g. |
180 114,5 |
48 631,0 |
228 745,5 |
15 noyabrya 2020 g. |
180 114,5 |
47 280,0 |
227 394,5 |
15 maya 2021 g. |
180 114,5 |
45 929,0 |
226 043,5 |
15 noyabrya 2021 g. |
180 114,5 |
44 578,5 |
224 693,0 |
15 maya 2022 g. |
180 114,5 |
43 227,5 |
223 342,0 |
15 noyabrya 2022 g. |
180 114,5 |
41 876,5 |
221 991,0 |
15 maya 2023 g. |
180 114,5 |
40 526,0 |
220 640,5 |
15 noyabrya 2023 g. |
180 114,5 |
39 175,0 |
219 289,5 |
15 maya 2024 g. |
180 114,5 |
37 824,0 |
217 938,5 |
15 noyabrya 2024 g. |
180 114,5 |
36 473,0 |
216 587,5 |
15 maya 2025 g. |
180 114,5 |
35 122,5 |
215 237,0 |
15 noyabrya 2025 g. |
180 114,5 |
33 771,5 |
213 886,0 |
15 maya 2026 g. |
180 114,5 |
32 420,5 |
212 535,0 |
15 noyabrya 2026 g. |
180 114,5 |
31 070,0 |
211 184,5 |
15 maya 2027 g. |
180 114,5 |
29 719,0 |
209 833,5 |
15 noyabrya 2027 g. |
180 114,5 |
28 368,0 |
208 482,5 |
15 maya 2028 g. |
180 114,5 |
27 017,0 |
207 131,5 |
15 noyabrya 2028 g. |
180 114,5 |
25 666,5 |
205 781,0 |
15 maya 2029 g. |
180 114,5 |
24 315,5 |
204 430,0 |
15 noyabrya 2029 g. |
180 114,5 |
22 964,5 |
203 079,0 |
15 maya 2030 g. |
180 114,5 |
21 614,0 |
201 728,5 |
15 noyabrya 2030 g. |
180 114,5 |
20 263,0 |
200 377,5 |
15 maya 2031 g. |
180 114,5 |
18 912,0 |
199 026,5 |
15 noyabrya 2031 g. |
180 114,5 |
17 561,0 |
197 675,5 |
15 maya 2032 g. |
180 114,5 |
16 210,5 |
196 325,0 |
15 noyabrya 2032 g. |
180 114,5 |
14 859,5 |
194 974,0 |
15 maya 2033 g. |
180 114,5 |
13 508,5 |
193 623,0 |
15 noyabrya 2033 g. |
180 114,5 |
12 158,0 |
192 272,5 |
15 maya 2034 g. |
180 114,5 |
15 807,0 |
190 921,5 |
15 noyabrya 2034 g. |
180 114,5 |
9 456,0 |
189 570,5 |
15 maya 2035 g. |
180 114,5 |
8 105,0 |
188 219,5 |
15 noyabrya 2035 g. |
180 114,5 |
6 754,5 |
186 869,0 |
15 maya 2036 g. |
180 114,5 |
5 403,5 |
185 518,0 |
15 noyabrya 2036 g. |
180 114,5 |
4 052,5 |
184 167,0 |
15 maya 2037 g. |
180 114,5 |
2 701,5 |
182 816,0 |
15 noyabrya 2037 g. |
180 118,5 |
1 351,0 |
181469,5 |
Vsego |
8 645 500 |
1 820 555,5 |
10 461 055,5 |
*) Summi platejey budut utochnyatsya v zavisimosti ot fakticheskiх dat osvoyeniya sredstv zayma ABR.
**) SDR - spetsialniye prava zaimstvovaniya. Kurs prinyat raschetno 1 SDR = 1,4458 doll. SShA.
***) V period realizatsii proyekta (2007-2010 gg.) predusmatrivayetsya viplata protsentov v schet zayma ABR.
k Postanovleniyu Prezidenta RUz
ot 08.01.2007 g. N PP-555
GRAFIK*
pogasheniya zayma ABR i viplati protsentov
po nemu po Navoiyskoy oblasti
Summa zayma |
8,6455 mln. SDR (ekv. 12,5 mln. doll. SShA)** |
Srok pogasheniya |
32 goda |
Lgotniy period |
8 let |
Protsentnaya stavka |
1,0% godoviх - v techeniye lgotnogo perioda |
1,5% godoviх - po istechenii lgotnogo perioda |
(SDR)
Data plateja |
Summa viplati po osnovnomu dolgu |
Summa viplati protsentov*** |
Obshchaya summa, podlejashchaya viplate*** |
2007-2010 gg. |
0 |
0 |
|
15 maya 2011 g. |
32 420,5 |
32 420,5 |
|
15 noyabrya 2011 g. |
43 227,5 |
43 227,5 |
|
15 maya 2012 g. |
43 227,5 |
43 227,5 |
|
15 noyabrya 2012 g. |
43 227,5 |
43 227,5 |
|
15 maya 2013 g. |
43 227,5 |
43 227,5 |
|
15 noyabrya 2013 g. |
43 227,5 |
43 227,5 |
|
15 maya 2014 g. |
180 114,5 |
43 227,5 |
223 342,0 |
15 noyabrya 2014 g. |
180 114,5 |
63 490,5 |
243 605.0 |
15 maya 2015 g. |
180 114,5 |
62 139,5 |
242 254,0 |
15 noyabrya 2015 g. |
180 114,5 |
60 788,5 |
240 903,0 |
15 maya 2016 g. |
180 114,5 |
59 438,0 |
239 552,5 |
15 noyabrya 2016 g. |
180 114,5 |
58 087,0 |
238 201,5 |
15 maya 2017 g. |
180 114,5 |
56 736,0 |
236 850,5 |
15 noyabrya 2017 g. |
180 114,5 |
55 385,0 |
235 499,5 |
15 maya 2018 g. |
180 114,5 |
54 034.5 |
234 149,0 |
15 noyabrya 2018 g. |
180 114,5 |
52 683,5 |
232 798,0 |
15 maya 2019 g. |
180 114,5 |
51 332,5 |
231 447,0 |
15 noyabrya 2019 g. |
180 114,5 |
49 982,0 |
230 096,5 |
15 maya 2020 g. |
180 114,5 |
48 631,0 |
228 745,5 |
15 noyabrya 2020 g. |
180 114,5 |
47 280,0 |
227 394,5 |
15 maya 2021 g. |
180 114,5 |
45 929,0 |
226 043,5 |
15 noyabrya 2021 g. |
180 114,5 |
44 578,5 |
224 693,0 |
15 maya 2022 g. |
180 114,5 |
43 227,5 |
223 342,0 |
15 noyabrya 2022 g. |
180 114,5 |
41 876,5 |
221 991,0 |
15 maya 2023 g. |
180 114,5 |
40 526,0 |
220 640,5 |
15 noyabrya 2023 g. |
180 114,5 |
39 175,0 |
219 289,5 |
15 maya 2024 g. |
180 114,5 |
37 824,0 |
217 938,5 |
15 noyabrya 2024 g. |
180 114,5 |
36 473,0 |
216 587,5 |
15 maya 2025 g. |
180 114,5 |
35 122,5 |
215 237,0 |
15 noyabrya 2025 g. |
180 114.5 |
33 771,5 |
213 886,0 |
15 maya 2026 g. |
180 114,5 |
32 420,5 |
212 535,0 |
15 noyabrya 2026 g. |
180 114,5 |
31 070,0 |
211 184,5 |
15 maya 2027 g. |
180 114.5 |
29 719,0 |
209 833,5 |
15 noyabrya 2027 g. |
180 114.5 |
28 368,0 |
208 482,5 |
15 maya 2028 g. |
180 114.5 |
27 017,0 |
207 131,5 |
15 noyabrya 2028 g. |
180 114,5 |
25 666,5 |
205 781,0 |
15 maya 2029 g. |
180 114,5 |
24 315,5 |
204 430,0 |
15 noyabrya 2029 g. |
180 114,5 |
22 964,5 |
203 079,0 |
15 maya 2030 g. |
180 114,5 |
21 614,0 |
201 728,5 |
15 noyabrya 2030 g. |
180 114,5 |
20 263,0 |
200 377,5 |
15 maya 2031 g. |
180 114,5 |
18 912,0 |
199 026,5 |
15 noyabrya 2031 g. |
180 114,5 |
17 561,0 |
197 675,5 |
15 maya 2032 g. |
180 114,5 |
16 210,5 |
196 325,0 |
15 noyabrya 2032 g. |
180 114,5 |
14 859,5 |
194 974,0 |
15 maya 2033 g. |
180 114,5 |
13 508,5 |
193 623,0 |
15 noyabrya 2033 g. |
180 114,5 |
12 158,0 |
192 272,5 |
15 maya 2034 g. |
180 114,5 |
15 807,0 |
190 921,5 |
15 noyabrya 2034 g. |
180 114,5 |
9 456,0 |
189 570,5 |
15 maya 2035 g. |
180 114,5 |
8 105,0 |
188 219,5 |
15 noyabrya 2035 g. |
180 114,5 |
6 754,5 |
186 869,0 |
15 maya 2036 g. |
180 114,5 |
5 403,5 |
185 518,0 |
15 noyabrya 2036 g. |
180 114,5 |
4 052,5 |
184 167,0 |
15 maya 2037 g. |
180 114,5 |
2 701,5 |
182.816,0 |
15 noyabrya 2037 g. |
180 118,5 |
1 351,0 |
181469,5 |
Vsego |
8 645 500 |
1 820 555,5 |
10 461 055,5 |
*) Summi platejey budut utochnyatsya v zavisimosti ot fakticheskiх dat osvoyeniya sredstv zayma ABR.
**) SDR - spetsialniye prava zaimstvovaniya. Kurs prinyat raschetno 1 SDR = 1,4458 doll. SShA.
***) V period realizatsii proyekta (2007-2010 gg.) predusmatrivayetsya viplata protsentov v schet zayma ABR.
k Postanovleniyu Prezidenta RUz
ot 08.01.2007 g. N PP-555
SOSTAV
Koordinatsionnogo soveta po realizatsii proyekta
"Vodosnabjeniye i sanitariya selskiх naselenniх
punktov Kashkadarinskoy i Navoiyskoy
oblastey" s uchastiyem Aziatskogo
banka razvitiya
Xanov N.M. |
- |
zamestitel Premyer-ministra, rukovoditel soveta |
Shoabduraхmanov P.M. |
- |
zamestitel ministra ekonomiki |
Tursunov Ye.E. |
- |
zamestitel ministra finansov |
Djurayev O. X. |
- |
zamestitel ministra vneshniх ekonomicheskiх svyazey, investitsiy i torgovli |
Musayev U.K. |
- |
zamestitel ministra narodnogo obrazovaniya |
Aliхanov B.B. |
- |
predsedatel Goskomprirodi |
Achilov M.K. |
- |
zamestitel predsedatelya Gosarхitektstroya |
Gorlov I.G. |
- |
zamestitel predsedatelya Goskomgeologii |
- |
glavniy spetsialist Svodnogo informatsionno-analiticheskogo departamenta po voprosam makroekonomicheskogo analiza i prognozirovaniya, reformirovaniya finansovoy i bankovskoy sistem, razvitiya chastnogo predprinimatelstva i malogo biznesa Kabineta Ministrov |
Nazirov N.T. |
- |
vedushchiy spetsialist Informatsionno-analiticheskogo departamenta po voprosam kommunalnoy sferi, transporta, kapitalnogo stroitelstva i stroyindustrii Kabineta Ministrov |
Mamadiyerov E.K. |
- |
perviy zamestitel хokima Kashkadarinskoy oblasti |
Eshonkulov A.O. |
- |
perviy zamestitel хokima Navoiyskoy oblasti |
Saidaliyev S. S. |
- |
nachalnik Departamenta Gossanepidnadzora Ministerstva zdravooхraneniya |
Toshmuхamedov F.T. |
- |
zamestitel nachalnika Gosudarstvennoy inspeksii "Sanoatkonteхnazorat" |
Xalmuхamedov U.A. |
- |
generalniy direktor agentstva "Uzkommunхizmat", otvetstvenniy sekretar soveta |
Primechaniye. Pri pereхode chlenov Soveta na druguyu rabotu v yego sostav vklyuchayutsya litsa, vnov naznachenniye na eti doljnosti.