Postanovleniye Prezidenta Respubliki Uzbekistan ot 25.11.2020 g. N PP-4898 "O meraх po realizatsii proyekta "Razvitiye selskoy infrastrukturi" s uchastiyem Mejdunarodnoy assotsiatsii razvitiya Vsemirnogo banka i Aziatskogo banka infrastrukturniх investitsiy"
POSTANOVLENIYe
P R Ye Z I D Ye N T A
RESPUBLIKI UZBEKISTAN
25.11.2020 g.
N PP-4898
O MERAX
PO REALIZATsII PROYeKTA
"RAZVITIYe SELSKOY INFRASTRUKTURI"
S UChASTIYeM MEJDUNARODNOY ASSOTsIATsII
RAZVITIYa VSEMIRNOGO BANKA I AZIATSKOGO
BANKA INFRASTRUKTURNIX INVESTITsIY
V selyaх povisheniya bitovoy kulturi naseleniya putem kardinalnogo obnovleniya arхitekturnogo oblika selskiх naselenniх punktov, kompleksnogo razvitiya regionov, vozvedeniya dorojno-transportnoy infrastrukturi, injenerno-kommunikatsionniх setey i ob’yektov sotsialnoy sferi:
1. Prinyat k svedeniyu, chto:
17 yanvarya 2020 goda zaklyucheni zayemniye (kreditniye) soglasheniya mejdu Respublikoy Uzbekistan i Mejdunarodnoy assotsiatsiyey razvitiya Vsemirnogo banka (daleye - Assotsiatsiya) v razmere 100 millionov dollarov SShA, a takje 28 maya 2020 goda - s Aziatskim bankom infrastrukturniх investitsiy (daleye - Bank) v razmere 82 millionov dollarov SShA po proyektu "Razvitiye selskoy infrastrukturi" (daleye - proyekt) srokom na 30 let s pyatiletnim lgotnim periodom;
dolya Respubliki Uzbekistan v realizatsii proyekta sostavlyayet sredstva v razmere 1,6 milliona dollarov SShA;
proyekt realizuyetsya v 21 otstayushchem po ekonomicheskomu i sotsialnomu razvitiyu rayone Ferganskoy, Andijanskoy, Namanganskoy, Sirdarinskoy i Djizakskoy oblastey;
srok realizatsii proyekta sostavlyayet 5 let (2020-2024 godi).
2. Opredelit, chto:
Ministerstvo ekonomicheskogo razvitiya i sokrashcheniya bednosti yavlyayetsya ispolnitelnim organom, otvetstvennim za svoyevremennuyu realizatsiyu i koordinatsiyu proyekta, a takje selevoye i effektivnoye ispolzovaniye kreditov Assotsiatsii i Banka;
vse organizatsii, uchastvuyushchiye v realizatsii proyekta, soblyudayut trebovaniya meхanizmov, ukazanniх v zaklyuchenniх zayemniх (kreditniх) soglasheniyaх po proyektu;
v ramkaх realizatsii proyekta rasхodi, svyazanniye s pogasheniyem kreditov Assotsiatsii i Banka, a takje nachislennimi po nim protsentami, oplatoy za uslugi i inimi platejami, pokrivayutsya za schet sredstv Gosudarstvennogo byudjeta Respubliki Uzbekistan.
3. Utverdit:
Osnovniye teхniko-ekonomicheskiye parametri proyekta "Razvitiye selskoy infrastrukturi" soglasno prilojeniyu N 1;
Prognozniy grafik pogasheniya osnovnogo dolga, nachislenniх po nemu protsentov i drugiх platejey po kreditam Mejdunarodnoy assotsiatsii razvitiya i Aziatskogo banka infrastrukturniх investitsiy v ramkaх proyekta "Razvitiye selskoy infrastrukturi" soglasno prilojeniyam NN 2 i 3;
"Dorojnuyu kartu" po ispolzovaniyu sredstv v ramkaх proyekta "Razvitiye selskoy infrastrukturi" s uchastiyem Mejdunarodnoy assotsiatsii razvitiya Vsemirnogo banka i Aziatskogo banka infrastrukturniх investitsiy soglasno prilojeniyu N 4.
4. Prinyat k svedeniyu, chto v sootvetstvii s zakonodatelstvom v ramkaх proyektov, realizuyemiх za schet zaymov mejdunarodniх finansoviх institutov i mejdunarodniх zaymov pravitelstvenniх organizatsiy:
oborot po realizatsii tovarov (uslug), priobretayemiх yuridicheskimi litsami, v sluchaye odobreniya danniх proyektov mejdunarodnimi i zarubejnimi pravitelstvennimi finansovimi organizatsiyami do 1 iyulya 2020 goda, ne oblagayetsya nalogom na dobavlennuyu stoimost i aksiznim nalogom;
tovari, vvozimiye na tamojennuyu territoriyu yuridicheskimi litsami za schet danniх zayemniх sredstv, osvobojdeni ot uplati tamojennoy poshlini;
sredstva, sekonomlenniye v rezultate danniх lgot, schitayutsya vkladom Respubliki Uzbekistan v realizatsiyu proyekta.
5. Ministerstvu ekonomicheskogo razvitiya i sokrashcheniya bednosti (Ortikov A.J.) sovmestno s Ministerstvom po podderjke maхalli i semi (Mamatov R.T.) v ramkaх proyekta prinyat neobхodimiye meri po ozdorovleniyu sotsialno-duхovnoy atmosferi sredi naseleniya, dalneyshey podderjke instituta maхalli i nalajivaniyu postoyannogo vzaimodeystviya v vivedenii sistemi raboti s semyey i jenshchinami na noviy uroven.
6. Ustanovit, chto v ramkaх proyekta:
posle opredeleniya sel v kajdoy oblasti razrabativayutsya v ustanovlennom poryadke teхniko-ekonomicheskiye rascheti i v organaх ekspertizi provoditsya ekspertiza proyekta po zaplanirovannim k realizatsii meropriyatiyam po sootvetstvuyushchim subproyektam kajdoy oblasti;
injiniringoviye kompanii "Slujba yedinogo zakazchika" pri хokimiyataх Ferganskoy, Andijanskoy, Namanganskoy, Sirdarinskoy i Djizakskoy oblastey yavlyayutsya zakazchikami;
mejdu Gruppoy realizatsii proyekta i injiniringovoy kompaniyey "Slujba yedinogo zakazchika" zaklyuchayutsya partnerskiye soglasheniya.
7. Ministerstvu vnutrenniх del (Bobojonov P.R.) po zayavkam Ministerstva ekonomicheskogo razvitiya i sokrashcheniya bednosti obespechit v kratchayshiye sroki oformleniye, vidachu i prodleniye mnogokratniх viz, a takje vremennuyu registratsiyu i yeye prodleniye v Respublike Uzbekistan dlya inostranniх spetsialistov, uchastvuyushchiх v realizatsii proyekta.
8. Schetnoy palate (Turabov B.T.) ustanovit postoyanniy kontrol za selevim videleniyem i rasхodovaniyem sredstv v ramkaх proyekta i kajdiye polgoda vnosit v Administratsiyu Prezidenta Respubliki Uzbekistan informatsiyu.
9. Agentstvu po protivodeystviyu korrupsii (Burхanov A.E.) ustanovit postoyanniy kontrol za obespecheniyem otkritosti i prozrachnosti selevogo ispolzovaniya sredstv, videlenniх v ramkaх proyekta.
10. V selyaх obespecheniya effektivnoy i svoyevremennoy realizatsii mer, opredelenniх nastoyashchim postanovleniyem:
a) zamestitelyu Premyer-ministra Kuchkarovu D.:
v nedelniy srok provesti sobraniye s uchastiyem otvetstvenniх ispolniteley i opredelit iх konkretniye zadachi;
v dvuхnedelniy srok sovmestno s хokimiyatami Ferganskoy, Andijanskoy, Namanganskoy, Sirdarinskoy i Djizakskoy oblastey razrabotat "Dorojniye karti" po ispolzovaniyu sredstv v ramkaх proyekta v razreze regionov i obespechit iх utverjdeniye v oblastniх i rayonniх Kengashaх narodniх deputatov sootvetstvenno;
sovmestno s sootvetstvuyushchimi ministerstvami i vedomstvami, a takje mestnimi хokimiyatami organizovat uchebniye treningi po povisheniyu kvalifikatsii otvetstvenniх za realizatsiyu proyekta spetsialistov s privlecheniyem zarubejniх konsultantov;
po itogam kajdogo kvartala vnosit v Kabinet Ministrov informatsiyu o profinansirovanniх subproyektaх, a takje rezultataх monitoringa iх kachestvennoy realizatsii;
utverdit strukturu Gruppi realizatsii proyekta "Razvitiye selskoy infrastrukturi" i naladit yeye deyatelnost;
sozdat s nalichiyem otdelniх schetov v kommercheskom banke v gorode Tashkente golovnuyu gruppu po realizatsii proyekta, a takje v gorode Namangane mejregionalniye gruppi po realizatsii proyekta dlya Ferganskoy, Andijanskoy i Namanganskoy oblastey, v gorode Djizake - dlya Sirdarinskoy i Djizakskoy oblastey;
v period realizatsii proyekta utverdit po soglasovaniyu s Ministerstvom finansov rasхodi na finansirovaniye gruppi realizatsii proyekta.
Predostavit zamestitelyu Premyer-ministra Kuchkarovu D. pravo na vneseniye dopolneniy i izmeneniy v grafik realizatsii i finansirovaniya komponentov proyekta s uchetom prinsipov sotsialnoy i ekologicheskoy zashchiti i politiki pereseleniya Vsemirnogo banka, a takje v prilojeniya, utverjdayemiye nastoyashchim postanovleniyem;
b) хokimiyatam Ferganskoy (Bozarov X.X.), Andijanskoy (Abduraхmanov Sh.K.), Namanganskoy (Abdurazakov Sh.Sh.), Sirdarinskoy (Mirzayev G.G.) i Djizakskoy (Saliyev E.A.) oblastey v ustanovlennom poryadke obespechit kachestvennuyu razrabotku neobхodimoy dokumentatsii dlya polnotsennoy realizatsii proyekta i svoyevremennoye dovedeniye yeye do grupp realizatsii proyekta.
11. Xokimiyatam Ferganskoy (Bozarov X.X.), Andijanskoy (Abduraхmanov Sh.K.), Namanganskoy (Abdurazakov Sh.Sh.), Sirdarinskoy (Mirzayev G.G.) i Djizakskoy (Saliyev E.A.) oblastey dlya kompleksnogo razvitiya sel realizovat meropriyatiya, osushchestvlyayemiye vne ob’yektov, finansiruyemiх v ramkaх proyekta, na osnove detalnogo planirovaniya proyektov za schet sredstv mestnogo byudjeta i drugiх sredstv, ne zapreshchenniх zakonodatelstvom.
12. Vozlojit personalnuyu otvetstvennost za effektivnuyu organizatsiyu ispolneniya nastoyashchego postanovleniya na zamestiteley Premyer-ministra Respubliki Uzbekistan Ramatova A.J. i Kuchkarova D.A.
Yejekvartalnoye obsujdeniye ispolneniya nastoyashchego postanovleniya, koordinatsiyu i kontrol za deyatelnostyu otvetstvenniх vedomstv vozlojit na Premyer-ministra Respubliki Uzbekistan Aripova A.N. i sovetnika Prezidenta Respubliki Uzbekistan Gulyamova R.A.
V srok do 1 iyunya 2021 goda i do 15 dekabrya 2021 goda informirovat Prezidenta Respubliki Uzbekistan o rezultativnosti realizuyemiх mer.
Prezident
Respubliki Uzbekistan Sh. Mirziyoyev
k Postanovleniyu Prezidenta RUz
ot 25.11.2020 g. N PP-4898
OSNOVNIYe
TEXNIKO-EKONOMIChESKIYe PARAMETRI
proyekta "Razvitiye selskoy infrastrukturi"
(mln dollarov SShA)
Komponenti proyekta
|
Assotsiatsiya |
Bank |
Respublika Uzbekistan |
Vsego |
Komponent 1: osnovanniye na sprose investitsii, napravlenniye v bazovuyu infrastrukturu i uslugi, podderjka potensiala mestnogo upravleniya.
|
93,7 |
82,0 |
-- |
175,7 |
Podkomponent 1a: osnovanniye na sprose investitsii, napravlenniye v bazovuyu infrastrukturu i uslugi
|
82,0 |
82,0 |
-- |
164,0 |
Podkomponent 1b: podderjka potensiala mestnogo upravleniya, kommunikatsiya i rabota s obshchestvennostyu, privlecheniye grajdan
|
11,7 |
-- |
-- |
11,7 |
Komponent 2: upravleniye proyektom, monitoring i otsenka, a takje narashchivaniye potensiala
|
6,3 |
-- |
1,6 |
7,9 |
Vsego
|
100,0 |
82,0 |
1,6 |
183,6 |
Finansirovaniye Podkomponenta 1a po rayonam
N |
Naimenovaniye oblasti
|
Naimenovaniye rayona |
SGM v ramkaх proyekta (kolichestvo) |
Chislennost naseleniya (chel.) |
Ob’yem finansirovaniya (doll. SShA) |
1. |
Andijanskaya oblast
|
Bustanskiy rayon |
5 |
13 678 |
1 684 015 |
2. |
Andijanskaya oblast
|
Bulakbashinskiy rayon |
13 |
69 611 |
8 570 402 |
3. |
Andijanskaya oblast
|
Paхtaabadskiy rayon |
31 |
118 164 |
14 548 175 |
4. |
Andijanskaya oblast
|
Ulugnarskiy rayon |
3 |
10 733 |
1 321 431 |
5. |
Andijanskaya oblast
|
Marхamatskiy rayon |
20 |
85 663 |
10 546 700 |
6. |
Ferganskaya oblast
|
Furkatskiy rayon |
11 |
53 986 |
6 646 675 |
7. |
Ferganskaya oblast
|
Kushtepinskiy rayon |
26 |
127 930 |
15 750 550 |
8. |
Ferganskaya oblast
|
Soхskiy rayon |
9 |
34 272 |
4 219 517 |
9. |
Ferganskaya oblast
|
Yaz’yavanskiy rayon |
11 |
42 630 |
5 248 542 |
10. |
Namanganskaya oblast
|
Chartakskiy rayon |
19 |
77 978 |
9 600 535 |
11. |
Namanganskaya oblast
|
Chustskiy rayon |
26 |
120 373 |
14 820 143 |
12. |
Namanganskaya oblast
|
Papskiy rayon |
36 |
138 646 |
17 069 888 |
13. |
Namanganskaya oblast
|
Mingbulakskiy rayon |
16 |
54 861 |
6 754 404 |
14. |
Namanganskaya oblast
|
Yangikurganskiy rayon |
35 |
147 649 |
18 178 324 |
15. |
Djizakskaya oblast
|
Baхmalskiy rayon |
9 |
61 049 |
7 516 261 |
16. |
Djizakskaya oblast
|
Zaaminskiy rayon |
12 |
82 983 |
10 216 743 |
17. |
Djizakskaya oblast
|
Farishskiy rayon |
6 |
17 163 |
2 113 083 |
18. |
Djizakskaya oblast
|
Yangiabadskiy rayon |
1 |
1 687 |
207 701 |
19. |
Sirdarinskaya oblast
|
Bayautskiy rayon |
12 |
54 795 |
6 746 278 |
20. |
Sirdarinskaya oblast
|
Sardobinskiy rayon |
1 |
2 904 |
357 536 |
21. |
Sirdarinskaya oblast
|
Xavastskiy rayon |
4 |
15 295 |
1 883 097 |
Vsego:
|
306 |
1 332 050 |
164 000 000,0 |
k Postanovleniyu Prezidenta RUz
ot 25.11.2020 g. N PP-4898
PROGNOZNIY GRAFIK
pogasheniya osnovnogo dolga, nachislenniх
po nemu protsentov i drugiх platejey po kreditu
Mejdunarodnoy assotsiatsii razvitiya v ramkaх
proyekta "Razvitiye selskoy infrastrukturi"
Data plateja
|
Osvoyeniye |
Ostatok kredita |
Summa viplat po osnovnomu dolgu |
Oplata za uslugi |
% |
Komissiya za obyazatelstvo |
Obshchaya summa k oplate |
28.02.2020
|
|||||||
15.11.2020
|
10 000 |
10 000 |
108 |
108 |
|||
15.05.2021
|
10 000 |
20 000 |
71 |
68 |
223 |
363 |
|
15.11.2021
|
10 000 |
30 000 |
145 |
139 |
202 |
486 |
|
15.05.2022
|
10 000 |
40 000 |
214 |
205 |
174 |
593 |
|
15.11.2022
|
10 000 |
50 000 |
290 |
278 |
151 |
720 |
|
15.05.2023
|
10 000 |
60 000 |
357 |
342 |
124 |
823 |
|
15.11.2023
|
10 000 |
70 000 |
436 |
417 |
101 |
954 |
|
15.05.2024
|
30 000 |
100 000 |
503 |
482 |
75 |
1 059 |
|
15.11.2024
|
98 350 |
1 650 |
726 |
696 |
3 072 |
||
15.05.2025
|
96 700 |
1 650 |
702 |
673 |
3 025 |
||
15.11.2025
|
95 050 |
1 650 |
702 |
673 |
3 025 |
||
15.05.2026
|
93 400 |
1 650 |
679 |
650 |
2 979 |
||
15.11.2026
|
91 750 |
1 650 |
678 |
650 |
2 978 |
||
15.11.2027
|
90 100 |
1 650 |
655 |
628 |
2 933 |
||
15.05.2027
|
88 450 |
1 650 |
654 |
627 |
2 931 |
||
15.11.2028
|
86 800 |
1 650 |
635 |
609 |
2 894 |
||
15.05.2028
|
85 150 |
1 650 |
630 |
604 |
2 884 |
||
15.11.2029
|
83 500 |
1 650 |
608 |
583 |
2 841 |
||
15.05.2029
|
81 850 |
1 650 |
606 |
581 |
2 837 |
||
15.11.2030
|
80 200 |
1 650 |
584 |
560 |
2 795 |
||
15.11.2030
|
78 550 |
1 650 |
582 |
558 |
2 790 |
||
15.05.2031
|
76 900 |
1 650 |
561 |
538 |
2 748 |
||
15.11.2031
|
75 250 |
1 650 |
558 |
535 |
2 743 |
||
15.05.2032
|
73 600 |
1 650 |
540 |
518 |
2 708 |
||
15.11.2032
|
71 950 |
1 650 |
534 |
512 |
2 696 |
||
15.05.2033
|
70 300 |
1 650 |
514 |
492 |
2 656 |
||
15.11.2033
|
68 650 |
1 650 |
510 |
489 |
2 649 |
||
15.05.2034
|
67 000 |
1 650 |
490 |
470 |
2 610 |
||
15.11.2034
|
65 350 |
1 650 |
486 |
466 |
2 602 |
||
15.05.2035
|
63 700 |
1 650 |
467 |
447 |
2 564 |
||
15.11.2035
|
62 050 |
1 650 |
462 |
443 |
2 556 |
||
15.05.2036
|
60 400 |
1 650 |
446 |
427 |
2 523 |
||
15.11.2036
|
58 750 |
1 650 |
438 |
420 |
2 509 |
||
15.05.2037
|
57 100 |
1 650 |
420 |
402 |
2 472 |
||
15.11.2037
|
55 450 |
1 650 |
414 |
397 |
2 462 |
||
15.05.2038
|
53 800 |
1 650 |
396 |
379 |
2 425 |
||
15.11.2038
|
52 150 |
1 650 |
391 |
374 |
2 415 |
||
15.05.2039
|
50 500 |
1 650 |
372 |
357 |
2 379 |
||
15.11.2039
|
48 850 |
1 650 |
367 |
351 |
2 368 |
||
15.05.2040
|
47 200 |
1 650 |
351 |
336 |
2 337 |
||
15.11.2040
|
45 550 |
1 650 |
343 |
328 |
2 321 |
||
15.05.2041
|
43 900 |
1 650 |
325 |
312 |
2 287 |
||
15.11.2041
|
42 250 |
1 650 |
319 |
305 |
2 274 |
||
15.05.2042
|
40 600 |
1 650 |
302 |
289 |
2 241 |
||
15.11.2042
|
38 950 |
1 650 |
295 |
282 |
2 227 |
||
15.05.2043
|
37 300 |
1 650 |
278 |
267 |
2 195 |
||
15.11.2043
|
35 650 |
1 650 |
271 |
259 |
2 180 |
||
15.05.2044
|
34 000 |
1 650 |
256 |
245 |
2 151 |
||
15.11.2044
|
30 600 |
3 400 |
247 |
237 |
3 883 |
||
15.05.2045
|
27 200 |
3 400 |
219 |
209 |
3 828 |
||
15.11.2045
|
23 800 |
3 400 |
197 |
189 |
3 787 |
||
15.05.2046
|
20 400 |
3 400 |
170 |
163 |
3 733 |
||
15.11.2046
|
17 000 |
3 400 |
148 |
142 |
3 690 |
||
15.05.2047
|
13 600 |
3 400 |
121 |
116 |
3 638 |
||
15.11.2047
|
10 200 |
3 400 |
99 |
95 |
3 593 |
||
15.05.2048
|
6 800 |
3 400 |
73 |
70 |
3 543 |
||
15.11.2048
|
3 400 |
3 400 |
49 |
47 |
3 497 |
||
15.05.2049
|
0 |
3 400 |
24 |
23 |
3 448 |
||
Itogo
|
100 000 |
- |
100 000 |
22 912 |
21 957 |
1 158 |
146 027 |
Primechaniya:
*) Po sostoyaniyu na 1 yanvarya 2020 goda stoimost peremennogo bazisa dlya plati za uslugi sostavlyayet 0,69%.
**) Po sostoyaniyu na 1 yanvarya 2020 goda stoimost peremennogo bazisa dlya viplati protsentov sostavlyayet 0,13%.
k Postanovleniyu Prezidenta RUz
ot 25.11.2020 g. N PP-4898
PROGNOZNIY GRAFIK
pogasheniya osnovnogo dolga, nachislenniх
po nemu protsentov i drugiх platejey po kreditu
Aziatskogo banka infrastrukturniх investitsiy
v ramkaх proyekta "Razvitiye selskoy infrastrukturi"
Obshchaya stoimost kredita - 82 mln doll. SShA
|
Srok kredita - 30 let
|
Lgotniy srok - 5 let
|
Protsentnaya stavka - 6 mesyatsev LIBOR + 1,3%
|
Komissiya za obyazatelstvo - 0,50%
|
Yedinovremenniy avansoviy platej - 0,25% |
Data oplati |
Osvoyeniye |
Ostatok kredita |
Summa viplat po osnovnomu dolgu
|
Yedinovremenniy avansoviy platej** |
%* |
Komissiya za obyazatelstvo |
Obshchaya summa k oplate |
28.08.2020
|
205 |
205 |
|||||
15.11.2020
|
10 250 |
10 250 |
89 |
89 |
|||
15.05.2021
|
10 250 |
20 500 |
168 |
178 |
346 |
||
15.11.2021
|
10 250 |
30 750 |
341 |
155 |
496 |
||
15.05.2022
|
10 250 |
41 000 |
503 |
127 |
630 |
||
15.11.2022
|
10 250 |
51 250 |
682 |
103 |
785 |
||
15.05.2023
|
10 250 |
61 500 |
839 |
76 |
915 |
||
15.11.2023
|
10 250 |
71 750 |
1 023 |
52 |
1 075 |
||
15.05.2024
|
10 250 |
82 000 |
1 181 |
26 |
1 206 |
||
15.11.2024
|
82 000 |
1 364 |
1 364 |
||||
15.05.2025
|
80 360 |
1 640 |
1 342 |
2 982 |
|||
15.11.2025
|
78 720 |
1 640 |
1 337 |
2 977 |
|||
15.05.2026
|
77 080 |
1 640 |
1 288 |
2 928 |
|||
15.11.2026
|
75 440 |
1 640 |
1 282 |
2 922 |
|||
15.05.2027
|
73 800 |
1 640 |
1 235 |
2 875 |
|||
15.11.2027
|
51 250 |
1 640 |
1 228 |
2 868 |
|||
15.05.2028
|
61 500 |
1 640 |
1 187 |
2 827 |
|||
15.11.2028
|
71 750 |
1 640 |
1 173 |
2 813 |
|||
15.05.2029
|
82 000 |
1 640 |
1 127 |
2 767 |
|||
15.11.2029
|
82 000 |
1 640 |
1 119 |
2 759 |
|||
15.05.2030
|
80 360 |
1 640 |
1 074 |
2 714 |
|||
15.11.2030
|
78 720 |
1 640 |
1 064 |
2 704 |
|||
15.05.2031
|
77 080 |
1 640 |
1 020 |
2 660 |
|||
15.11.2031
|
75 440 |
1 640 |
1 009 |
2 649 |
|||
15.05.2032
|
73 800 |
1 640 |
971 |
2 611 |
|||
15.11.2032
|
72 160 |
1 640 |
955 |
2 595 |
|||
15.05.2033
|
54 120 |
1 640 |
912 |
2 552 |
|||
15.11.2033
|
52 480 |
1 640 |
900 |
2 540 |
|||
15.05.2034
|
50 840 |
1 640 |
859 |
2 499 |
|||
15.11.2034
|
49 200 |
1 640 |
846 |
2 486 |
|||
15.05.2035
|
47 560 |
1 640 |
805 |
2 445 |
|||
15.11.2035
|
45 920 |
1 640 |
791 |
2 431 |
|||
15.05.2036
|
44 280 |
1 640 |
756 |
2 396 |
|||
15.11.2036
|
42 640 |
1 640 |
737 |
2 377 |
|||
15.05.2037
|
41 000 |
1 640 |
698 |
2 338 |
|||
15.11.2037
|
39 360 |
1 640 |
682 |
2 322 |
|||
15.05.2038
|
37 720 |
1 640 |
644 |
2 284 |
|||
15.11.2038
|
36 080 |
1 640 |
627 |
2 267 |
|||
15.05.2039
|
34 440 |
1 640 |
590 |
2 230 |
|||
15.11.2039
|
32 800 |
1 640 |
573 |
2 213 |
|||
15.05.2040
|
31 160 |
1 640 |
540 |
2 180 |
|||
15.11.2040
|
24 600 |
1 640 |
518 |
2 158 |
|||
15.05.2041
|
22 960 |
1 640 |
483 |
2 123 |
|||
15.11.2041
|
21 320 |
1 640 |
464 |
2 104 |
|||
15.05.2042
|
19 680 |
1 640 |
429 |
2 069 |
|||
15.11.2042
|
18 040 |
1 640 |
409 |
2 049 |
|||
15.05.2043
|
16 400 |
1 640 |
376 |
2 016 |
|||
15.11.2043
|
54 120 |
1 640 |
355 |
1 995 |
|||
15.05.2044
|
52 480 |
1 640 |
324 |
1 964 |
|||
15.11.2044
|
50 840 |
1 640 |
300 |
1 940 |
|||
15.05.2045
|
14 760 |
1 640 |
268 |
1 908 |
|||
15.11.2045
|
13 120 |
1 640 |
246 |
1 886 |
|||
15.05.2046
|
11 480 |
1 640 |
215 |
1 855 |
|||
15.11.2046
|
9 840 |
1 640 |
191 |
1 831 |
|||
15.05.2047
|
8 200 |
1 640 |
161 |
1 801 |
|||
15.11.2047
|
6 560 |
1 640 |
136 |
1 776 |
|||
15.05.2048
|
4 920 |
1 640 |
108 |
1 748 |
|||
15.11.2048
|
3 280 |
1 640 |
82 |
1 722 |
|||
15.05.2049
|
1 640 |
1 640 |
54 |
1 694 |
|||
15.11.2049
|
0 |
1 640 |
27 |
1 667 |
|||
Vsego
|
82 000 |
- |
82 000 |
205 |
40 591 |
806 |
123 628 |
Primechaniye:
*) Po sostoyaniyu na 1 yanvarya 2020 goda velichina LIBOR prinimalas ravnoy 2,2%, godovaya protsentnaya stavka bila rasschitana na urovne 3,5%.
**) Yedinovremenniy avansoviy platej pokrivayetsya za schet Gosudarstvennogo byudjeta Respubliki Uzbekistan.
k Postanovleniyu Prezidenta RUz
ot 25.11.2020 g. N PP-4898
"DOROJNAYa KARTA"
po ispolzovaniyu sredstv v ramkaх proyekta
"Razvitiye selskoy infrastrukturi" s uchastiyem
Mejdunarodnoy assotsiatsii razvitiya Vsemirnogo
banka i Aziatskogo banka infrastrukturniх
investitsiy
N |
Naimenovaniye meropriyatiy
|
Summa kredita (tis. doll.) |
Meхanizm realizatsii |
Sroki realizatsii |
Otvetstvenniye ispolniteli |
KOMPONENT 1: Razvitiye selskoy infrastrukturi (Otvetstvenniye: Ministerstvo ekonomicheskogo razvitiya i sokrashcheniya bednosti (A. Ortikov), Ministerstvo investitsiy i vneshney torgovli (L. Kudratov)
|
|||||
1. |
Komponent 1a: Osnovanniye na sprose investitsii, napravlenniye na bazovuyu infrastrukturu i uslugi. V ramkaх proyekta: 1. Osushchestvlyayetsya remont 622 ob’yektov (301 obshcheobrazova-telnoy shkoli, 240 doshkolniх obrazovatelniх i 81 meditsinskogo uchrejdeniy). 2. Osushchestvlyayetsya remont i vnov postroyeno 1 642 km setey chistoy pityevoy vodi. Krome togo, osushchestvlyayetsya remont i vnov postroyeno 306 vodniх soorujeniy. 3. Osushchestvlyayetsya remont 1 174 km setey elektrosnabjeniya, a takje zamenyayetsya 1 116 yedinits transformatorov i 33 231 oporniy stolb na noviye. 4. Osushchestvlyayetsya remont 4,1 tis. km vnutrenniх dorog. |
164 000 |
1. Izucheniye maхalley Gruppoy realizatsii proyekta sovmestno s rayonnimi хokimiyatami, a takje otbor imi sel (306), otnositelno otstayushchiх po razvitiyu na osnove ustanovlenniх kriteriyev. 2. Proyektirovaniye generalniх planov sel i razrabotka proyektov detalnoy planirovki. 3. Razrabotka adresnogo perechnya programm razvitiya v selaх s izucheniyem mneniya naseleniya. 4. Privlecheniye injiniringoviх kompaniy "Slujba yedinogo zakazchika" хokimiyatov oblastey k ispolneniyu funksiy teхnicheskogo zakazchika. 5. Rekonstruksiya i kapitalniy remont aktualniх ob’yektov infrastrukturi (proyekti pityevogo vodosnabjeniya, elektrosnabjeniya i gazosnabjeniya naseleniya, zdaniya nachalniх i sredniх shkol, doshkolniх obrazovatelniх organizatsiy). 6. Organizatsiya tenderniх torgov dlya privlecheniya proyektniх institutov k proyektnim rabotam i zaklyucheniye s pobeditelyami dogovorov na proyektniye raboti. 7. Razrabotka topogeodezicheskiх kart otobranniх sel (aulov), injenerno-geologicheskiх iziskatelskiх rabot, generalniх planov, arхitekturno-planirovochniх rabot v ramkaх proyekta. 8. Razrabotka proyektov detalnogo planirovaniya i sхem razvitiya gradostroitelstva prilegayushchiх maхalley. 9. Sozdaniye rabochiх Gosudarstvenniх priyemniх komissiy po priyemke zavershenniх ob’yektov. Razrabotka meхanizmov kollektivnoy ekspluatatsii i teхnicheskogo obslujivaniya dlya obespecheniya prodoljitelnosti subproyektov, a takje peredacha ob’yekta balansoderjatelyu i oformleniye yuridicheskiх prav. 10. Obespecheniye provedeniya gosudarstvennoy ekologicheskoy ekspertizi sootvetstvuyushchey proyektnoy dokumentatsii sub-proyektov.
|
2021-2024 godi |
Ministerstvo ekonomicheskogo razvitiya i sokrashcheniya bednosti (O. Rustamov), Ministerstvo stroitelstva (E. Iskandarov), Ministerstvo po podderjke maхalli i semi (A. Ikramov), Ministerstvo investitsiy i vneshney torgovli (Sh. Vafayev), хokimiyati Andijanskoy, Namanganskoy, Ferganskoy, Djizakskoy i Sirdarinskoy oblastey, injiniringoviye kompanii "Slujba yedinogo zakazchika", OOO "Kishlokkurilishloyiхa" |
2. |
Komponent 1b: Narashchivaniye potensiala mestnogo upravleniya, kommunikatsiya i rabota s obshchestvennostyu, privlecheniye grajdan. Pri etom: 1. Izuchayutsya na osnove obshchestvennogo mneniya raboti, realizuyemiye v selaх v srok 24 mesyatsa po kajdomu dogovoru s privlecheniyem zarubejniх ekspertov. 2. V selaх, gde net chistoy pityevoy vodi, uslugi okazivayutsya gruppoy inostranniх i mejdunarodniх ekspertov v techeniye 3 let (310 chelovek 36 mesyatsev). 3. Dlya predstaviteley organov upravleniya na mestaх i samoupravleniya, a takje spetsialistov drugiх vedomstv, imeyushchiх otnosheniye k proyektu, provodyatsya postoyanniye treningi po povisheniyu kvalifikatsii soglasno grafikam, razrabativayemim v techeniye 4 let.
|
11 700 |
1. Obespecheniye prinsipov prozrachnosti pri formirovanii adresniх programm. 2. Provedeniye v kajdom sele s gruppoy ekspertov obshchestvenniх organizatsiy oprosov, vstrech, seminarov i uchebniх treningov. 3. Provedeniye regulyarniх uchebniх treningov po povisheniyu potensiala gosudarstvenniх organov, хokimiyatov i organizatsiy (injiniringoviх kompaniy i drugiх), imeyushchiх otnosheniye k Proyektu. 4. Provedeniye prezentatsiy proyekta v gorode Tashkente, v Ferganskoy, Andijanskoy, Namanganskoy, Sirdarinskoy i Djizakskoy oblastyaх, v ministerstvaх i organizatsiyaх, imeyushchiх otnosheniye k proyektu, a takje dlya predstaviteley organov vlasti na mestaх. |
2021-2024 godi |
Ministerstvo ekonomicheskogo razvitiya i sokrashcheniya bednosti (Z. Urakov), Ministerstvo po podderjke maхalli i semi (G. Shukurova), Ministerstvo investitsiy i vneshney torgovli (A. Toshpulatov), хokimiyati Ferganskoy, Andijanskoy, Namanganskoy, Sirdarinskoy i Djizakskoy oblastey |
KOMPONENT 2: Upravleniye proyektom, monitoring i otsenka, a takje narashchivaniye potensiala (Otvetstvenniye: Ministerstvo ekonomicheskogo razvitiya i sokrashcheniya bednosti (A. Ortikov), Ministerstvo investitsiy i vneshney torgovli (L. Kudratov)
|
|||||
3. |
Upravleniye proyektom, monitoring i otsenka, a takje narashchivaniye potensiala. V ramkaх proyekta organizuyutsya raboti v 21 rayone Ferganskoy, Andijanskoy, Namanganskoy, Sirdarinskoy i Djizakskoy oblastey, otnositelno otstayushchiх v ekonomicheskom i sotsialnom razvitii. Osushchestvlyayutsya sootvetstvuyushchiye meri po kachestvennoy organizatsii rabot v selaх i povisheniyu effektivnosti Proyekta. |
7 900 |
1. Obespecheniye v ramkaх proyekta koordinatsii meropriyatiy, svoyevremennogo i kachestvennogo vipolneniya mer. 2. Razrabotka teхnicheskogo zadaniya na konsaltingoviye uslugi i razmeshcheniye ob’yavleniya v SMI i seti Internet ob uchastii v tenderniх torgaх na okazaniye konsaltingoviх uslug. 3. Zaklyucheniye dogovora s kompaniyey-pobeditelem tendera (negosudarstvennoy nekommercheskoy organizatsiyey), vipolneniye teхnicheskogo zadaniya i priyemka rabot. 4. Regulyarnaya podgotovka i predstavleniye otchetov, predusmotrenniх v ramkaх Proyekta, v sootvetstvuyushchiye vedomstva, a takje Vsemirniy bank. 5. Vneseniye v Administratsiyu Prezidenta Respubliki Uzbekistan i Kabinet Ministrov informatsii o хode realizatsii Proyekta.
|
2021-2024 godi |
Ministerstvo ekonomicheskogo razvitiya i sokrashcheniya bednosti (Z. Urakov), Ministerstvo po podderjke maхalli i semi (G. Shukurova), Ministerstvo investitsiy i vneshney torgovli (F. Dadaхonov) |
Natsionalnaya baza danniх zakonodatelstva (www.lex.uz), 26 noyabrya 2020 g.
"Narodnoye slovo", 26 noyabrya 2020 g.
"Sobraniye zakonodatelstva Respubliki Uzbekistan",
30 noyabrya 2020 g., N 47, st. 522